nomadpete Posted 4 hours ago Posted 4 hours ago (edited) I remind you that the Brisbane pumped hydo has been running for about 45 years. it has two turbines capable of 600Mw with online ability in seconds. Maintenance costs are a fraction of other generator types as there are no burners, fuel delivery or storage, no waste or boilers or turbines. There must be plenty of other locations suitable for more plant like this. I suspect that Snowy was more of a political than sensible decision. Edited 4 hours ago by nomadpete
facthunter Posted 3 hours ago Posted 3 hours ago They ran into terrible rock formations that were unexpected with the Snowy site. It's there for energy Storage and available at short Notice. There's Plenty of suitable sites all along the East Coast of Australia with no need at all to use salt water. You use the water over and over. Nev
Siso Posted 55 minutes ago Posted 55 minutes ago If they are so good(and I love pumped hydro) Why aren't they building more. Ireland has one that fills up at night with coal and then runs with coal during the day. That runs well. Turlogh hill I think. You are right there are other spots around the east coast of Australia, doesn't do the rest of us much good. You think they would have had some geologists and engineers that would have allowed for hitting rock when boring through a mountain in the initial price. I think they under quoted so they could get started and then slug the government more money later on. bet that has never been done before!! Same ting is happening with a lot of transmission projects https://www.afr.com/policy/energy-and-climate/transgrid-inflated-cost-of-running-power-line-underground-farmers-20230718-p5dp2o https://www.abc.net.au/news/2025-03-01/energy-transmission-project-billion-blowout/104983108 1
nomadpete Posted 45 minutes ago Posted 45 minutes ago 1 minute ago, Siso said: Why aren't they building more. My cynical suspicion is the same reason that Australian infrastructure always lags behind the needs of the populace. There are no votes in infrastructure that won't be finished before the next election. Combine that with the desperate attempts to avoid the opposition labelling it "overspending", and winning the next election. This applies to highways, railways, public transport, hospitals, power and water. etc, etc. Maybe also, the public has learned to expect that even after all these years of practice, governments still can't write a decent contract that doesn't allow for endless cost blowouts.
octave Posted 38 minutes ago Posted 38 minutes ago 11 minutes ago, Siso said: Why aren't they building more If you are referring to the whole world, well, they are building more. Globally, pumped hydro has ~200 GW of installed capacity That represents the vast majority (over 90%) of long-duration energy storage Dozens of new projects are still being built each year So while individual schemes are large and relatively few compared to, say, solar farms, they are widespread and globally significant. 📍 Where are they? 🇨🇳 China (world leader) Largest total capacity (~50+ GW) Massive new projects like Fengning (one of the world’s biggest) Hundreds more under construction 👉 China uses pumped hydro heavily to stabilise its huge wind and solar buildout. 🇯🇵 Japan ~20+ GW installed One of the earliest adopters Built to balance nuclear and now renewables 🇺🇸 United States ~16–17 GW installed Famous example: Bath County (often called the “world’s largest battery”) 🇪🇺 Europe (widely distributed) Major countries: Germany, Switzerland, Austria, Spain Example: Germany has multiple plants used for grid balancing Scotland hosts many of the UK’s biggest schemes 🇦🇺 Australia Existing: Shoalhaven scheme (NSW) Tasmanian hydro system Major new build: Snowy 2.0 (huge expansion project) 🌎 Other notable regions South America – Brazil and Chile expanding capacity India – growing fast to support solar Africa – early-stage development (e.g., South Africa) 👍 Are they successful? Short answer: Yes—very successful, but with caveats ✅ Strengths 1. Proven and reliable Technology has been used for 50+ years Extremely well understood and dependable 2. Grid stabilisation Acts like a giant battery: Stores excess power Releases it when needed 3. Long lifespan Often lasts 50–100 years (much longer than batteries) 4. Scale Can store huge amounts of energy (hours to days) ⚠️ Limitations 1. Geography matters Needs suitable elevation and water Not every location works economically 2. High upfront cost Big civil engineering projects (tunnels, dams) 3. Long build times Projects like Snowy 2.0 take years and can face delays 4. Environmental concerns Land use, water impacts, and community opposition 🤔 Big-picture takeaway Pumped hydro is not new or experimental—it’s the backbone of global energy storage. It’s especially valuable as countries add more wind and solar. While batteries are growing fast, pumped hydro still dominates for large-scale, long-duration storage. 🌍 How much is being built? Around 100+ GW of pumped hydro is already under construction globally The total development pipeline is enormous (~600 GW) Annual additions are rising and could double to ~16.5 GW per year by 2030 👉 That’s not a niche build-out—that’s a major global infrastructure push. 📍 Where is the construction happening? 🇨🇳 China (dominates the boom) By far the biggest builder 200+ GW under construction alone Adding multiple large plants every year 👉 China is essentially treating pumped hydro as core grid infrastructure for renewables. 🇮🇳 India & Asia-Pacific Rapid expansion to support solar growth New multi-GW projects announced (e.g. Maharashtra schemes) Strong growth across Asia-Pacific generally 🇪🇺 Europe Lots of medium-sized projects and upgrades Example: New plant in Norway (Illvatn) under construction Hybrid wind + pumped hydro projects (e.g. Crete) 👉 Europe is modernising older hydro + adding storage rather than building mega-dams. 🇺🇸 United States Several projects in development: Example: Seminoe (900 MW) Many more proposed—potential to more than double capacity 🇦🇺 Australia (your backyard) Active pipeline: Kidston (QLD) nearing completion Snowy 2.0 under construction Multiple NSW & QLD proposals ⚠️ But: Some projects have been delayed or cancelled due to cost blowouts or geology issues (e.g. Pioneer-Burdekin) 🌎 Other regions Spain: dozens of projects progressing (25 advancing in 2025 alone) Africa: early but accelerating growth South America: Chile & Brazil expanding 📈 Why the sudden surge? This is the key shift: 👉 Wind and solar are now cheap—but intermittent 👉 Grids need long-duration storage (hours to days) Pumped hydro is: Proven Long-lasting (50–100 years) Scalable to huge sizes That’s why it’s having what’s been described as a “renaissance” in energy systems Reality check (it’s not all smooth) Even though many are being built: ✔ What’s going well Strong government backing Clear role in renewable grids Massive scale possible ✖ What’s slowing things down Long build times (often 7–10 years) Cost overruns (common in big civil projects) Environmental approvals Site-specific risks (geology can kill projects) 1
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now